Casting overhead crane is the main lifting and transferring equipment of steel company casting workshop
Used on casting process to transfer liquid metal, pouring and charge molten iron
This type crane adopts double girder structure, it is consist of crane frame, trolley and hook, beam, crane traveling and electrical parts
Main hook fetch device is fix distance hook beam
Used to lift and transfer steel ladle
Secondary hook is used to cooperate with main to pour the molten iron, slag and other auxiliary lifting operations
Foundry crane is one of the main equipment in the continuous casting technology of steel making
Mainly used for pouring melted iron from additive bay of converter to converter; lifting molten steel from refining bay to refining furnace or lifting molten steel from molten steel bay to ladle turret of continuous casting machine
Overall structure of foundry crane has the following forms: two girder and two rail, four girder and four rail, four girder, six rail and more
Form of two girder and two rail, four girder and four rail, are mainly used for middle and large-tonnage foundry crane; the form of four-girder and six-rail and two trolley is mainly used for extra large-tonnage foundry crane
Environmental conditions:
Power of crane
Three-phase AC
Rated frequency: 50Hz
Rated voltage: 380V
Working environment temperatures: -10 to 60°C
Relative humidity: no more than 50% RH when the temperature is 40°C
Requirements are more than above-mentioned, it shall carry out the requirements in the purchase contract as the users needs
Ordering instructions:
Basic parameters (rated lifting weight, lifting height, span and more) of the crane shall be described clearly when the user orders goods or signs a contract so that the product which may satisfy the working condition can be supplied